Ready nowvsBuy earlier
5 things to weigh before you choose
Timeline, money, patience decide.
Swipe →01/10
Rent while you wait can wipe out the saving.
SampleChange any number.
₹10.8 Lrent before you move in
₹45,000 × 24 months
Rent wipes out the saving. Ready-to-move wins by ₹2.8 L.
Loan starts early? Add pre-EMI (interest-only EMI before possession).
5 things to weigh before you choose
Timeline, money, patience decide.
Swipe →01/10
₹45,000 × 24 months =₹10.8 L rent
6 more months?+₹2.7 L
Handover dates can move.
02/10
RERA registration is not a delivery guarantee.
03/10
5% GST before completion certificate. GST Council ↗
04/10
Example₹1.5 Cr × 5% GST = ₹7.5 LGST Council ↗
Add taxes, costs and rent to both.
05/10
Rent and pre-EMI can overlap.
06/10
Earlier is not always cheaper.
07/10
08/10
Can wait?Look closer at under construction.
Must move soon?Start with ready homes.
09/10
10/10
Move in when?
Paying rent now?
What matters more?
Lower entry price matters?
Tap your answers.
0 of 4 answered
| Factor | Ready to move | Under construction |
|---|---|---|
| Price | A fixed, final number once you add stamp duty, registration and dues. No construction GST. | Lower entry price, but GST where it applies, project charges and interiors can close the gap. |
| Choice of units | Limited to what's still unsold. | Wider choice of floor, facing and layout while stock is fresh. |
| Move-in time | Right away, once the papers check out. | Often a few years, and dates can move. Check the completion date on K-RERA ↗ |
| Payment structure | Usually one payment, or one loan release at registration. | Staged, construction-linked payments spread over the build. |
| Rent while you wait | None. You move straight in. | You keep paying rent, and maybe pre-EMI (interest-only EMI before possession), until handover. |
| Total cost | Higher upfront, fewer costs stacking up later. | Lower upfront, but rent, GST and delay decide the real total. |
It depends on your timeline and how much risk you can take on. Ready to move suits buyers who need certainty and want to skip construction risk. Under construction suits buyers who can wait, want a wider choice of units, and can manage a staged payment plan. Compare the full cost of each, not just the sticker price, before deciding.
More than most buyers plan for. At ₹45,000 a month, 24 months of waiting comes to ₹10.8 lakh in rent, and every extra 6-month delay adds about ₹2.7 lakh more. Use your own rent and a realistic possession estimate, not the builder's original date, to work out your number.
It varies by project, and it is often a few years from booking to handover. Dates can move. Check the completion date the builder filed on Karnataka RERA, ask for the latest site update and a written possession date rather than the original marketing timeline, and build a buffer into your own plan.
The starting price usually is, but the final price often isn't. Under-construction homes can carry GST where applicable, project charges and a payment plan spread over years, plus the rent you pay while you wait. Compare the all-in total, rent included, before assuming the lower quoted price wins.
Five things: the RERA registration and construction phase, approved plans and written specifications, the actual payment schedule against your cash flow, the current unit-specific price, and what's currently available versus already sold. RERA registration confirms the project is registered — it doesn't guarantee the possession date holds.
Confirm the ownership papers, occupancy documents and any pending dues on the unit. See the actual rooms, light, noise and parking in person rather than relying on photos. A finished building removes construction risk, but it doesn't automatically mean a clean title.
Sometimes, but only after you add GST where it applies, project charges and the rent you'll pay until possession. Run both totals side by side over the same time period before deciding the lower sticker price wins.
Under construction, generally, since more floors, facings and layouts are still available before the project sells out. Ready-to-move inventory is whatever's left unsold, which can mean fewer options in the exact configuration you want.