S2O Advisors guide · PDF, 15 pages

Ready flat or under construction?

“Under construction one is 8L cheaper. Possession in 2 years, and my rent is 45k. Is the discount worth it?” This guide counts both flats for the same months.

  • 15 pages
  • Both flats side by side
  • A sum to fill for your flat

No fee for buyers. 15 pages · 1.9 MB

Page 1 of the guide: Ready flat or under construction?
Does this sound like you?
  • The under construction one is 8L cheaper. Is it really?
  • Possession in 2 years, sir.
  • We pay 45k rent till then. Does the discount cover it?
From the guide

Both flats, for the same 24 months

26.8LReady flat24 months: extra price + rent + interest
20.8LUnder construction24 months: extra price + rent + interest

Both flats have a loan of 1.2 cr at 8% for 20 years. The ready one costs 8L more, all-in with GST.

If possession comes on time, the under construction flat costs about 6L less. Each month late takes about 49k off that.

At about 13 months late, the two flats cost the same.

Example figures. Rent with no rise. Loan released in 24 equal parts. Maintenance and tax left out.

Each month while you wait

Count only the interest, not the full EMI

One EMI of 1L, in the first months

With the ready flat you pay the full EMI from the first month, and no rent. Most of an EMI in the first years is interest. The rest comes off your loan, so count only the interest.

Message to send the builder

“Please share the repayment schedule for a loan of ___ at ___%, with the interest for each month.”

Example figures.

If the date moves

What each month of delay costs

0L2L4L6L02468101214Months late123
  1. 1On time: the under construction flat costs about 6L less.
  2. 2Six months late adds about 2.9L, so the gap is about 3.1L.
  3. 3At about 13 months late, the two flats cost the same.

Each month late takes about 49k off the under construction flat's saving.

Message to send the builder

“Which projects did you hand over last, and on what dates?”

Example figures.

What's inside

What the guide covers

  • A ready flat and an under construction flat, side by side, for the same 24 months.
  • How much of each EMI is interest while you wait.
  • What each month of delay adds, if the date moves.
  • A sum to fill in for both flats.
  • The sales guy's lines, and what to ask.
Page: both flats, for the same 24 months
Page: each month while you wait
Page: if the date moves
Your months, from the RERA page

Rent while you wait

45krent a month
×
24months of waiting
=
10.8Lrent till possession

Take the completion date from K-RERA and keep a few months extra. Dates can move. If your rent goes up at renewal, use the higher rent.

Example figures.

At the sales office

What the sales guy says, and what it means

  • The sales guy“Possession in 2 years, sir.”

    What it meansAsk for the RERA completion date in writing, and count your months from that.

  • The sales guy“Ready flats cost more. This one is 8L less.”

    What it meansAdd rent and interest for both, for the same months.

  • The sales guy“This one is ready to move.”

    What it meansAsk to see the OC, and if GST is on the cost sheet. Some flats are sold as ready before the OC.

What we do for you

The guide gives you the sum. We do it for your two flats.

  1. 01

    Send us both flats, or just the projects.

    And your rent, if you are renting.

  2. 02

    We count both flats for your rent, your loan and the dates.

    We ask the builder for the RERA completion date in writing.

  3. 03

    An S2O advisor calls you and goes through the sum.

    So you know which one costs less for you.

Talk to an advisor

Send us both flats. We'll count it for you.

Less time searching. Less money wasted.

  • 100+families advised
  • 65buying decisions
  • 10+months of advising
No fee for buyers. · An S2O advisor will call you.
Questions

Questions people ask

Does the guide cost anything?

No. The guide and our help have no fee for buyers.

Which costs less, ready or under construction?

It depends on your rent, your loan and how late possession is. In the guide's example, the under construction flat costs about 6L less if possession is on time, and both cost the same at about 13 months late.

How do I know the possession date?

Take the completion date from the project's K-RERA page and keep a few months extra. Dates can move.

The flat is sold as ready to move. What do I check?

Ask to see the OC, and check if GST is on the cost sheet. Some flats are sold as ready before the OC.

Will you share my number with the builder?

Only if you ask us to. We never sell your number.

Example figures. · Guidance, not legal or tax advice. If you claim tax on loan interest or HRA, ask your CA how it changes your sum.

Share requirements